Report – Final Revised Feasibility Study for LHAAP-18/24, Burning Ground No. 3 and Unlined Evaporation Pond, Longhorn Army Ammunition Plant, Karnack, Texas
Year:
2017
Author: AECOM Technical Services
Recipient:
U.S. Army Corps of Engineers
Bate Stamp Range: 00692951 - 00731961
Report – Draft Final 1st Annual Remedial Action Operation Report for LHAAP-67, Above Ground Storage Tank Farm, Longhorn Army Ammunition Plant, Karnack, Texas
Year:
2017
Author: AECOM Technical Services
Recipient:
U.S. Army Corps of Engineers
Bate Stamp Range: 00731962 - 00737041
Letter – Cessation of Perimeter Well Sampling Requirement of the December 2, 1999 Dispute Resolution, Longhorn Army Ammunition Plant, Karnack, Texas
Year:
2017
Author: U.S. Army Corps of Engineers
Recipient:
All Stakeholders
Bate Stamp Range: 00737042 - 00737045
Memorandum for Record – Groundwater Sampling Methodology and Perchlorate Analytical Results for September 2016, LHAAP-003-R (Ground Signal Test Area), Longhorn Army Ammunition Plant, Karnack, Texas
Year:
2017
Author: AECOM Technical Services
Recipient:
U.S. Army Corps of Engineers
Bate Stamp Range: 00737046 - 00737220
Report – Draft Final 2nd Annual Remedial Action Operation Report for LHAAP-67, Above Ground Storage Tank Farm, Longhorn Army Ammunition Plant, Karnack, Texas